Keepro Hybrid Air Hose, Flexible 3/8 Inch ID x 6 Feet Long Lead-in Short Air Compressor Hose with Swivel Solid Brass 1/4" Industrial Quick Coupler and Plug, 300 PSI Maximum Pressure, Red

★★★★★ 4.1 80 reviews

US$6.80
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by bienen.ucepts.de
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$6.80
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Nov 23
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by bienen.ucepts.de
Free 30-day returns Details

Product details

Management number 225183117 Release Date 2026/05/09 List Price US$6.80 Model Number 225183117
Category
  • SPECIFICATIONS: Heavy-duty 3/8-inch ID hybrid air hose designed for professional use with a maximum pressure rating of 300 PSI
  • DURABILITY: Flexible red rubber and pvc blended construction resists kinking, coiling, and weather damage while maintaining excellent flexibility at -40 to 150 degree F.
  • CONNECTIONS: Features SWIVEL brass fittings on both ends with sturdy strain relief grips for secure attachment to air tools and compressors
  • VERSATILITY: Perfect for use with nail guns, impact wrenches, spray guns, and other pneumatic tools requiring consistent air pressure
  • DESIGN: High-visibility red color enhances workplace safety and makes the hose easy to locate on job sites
ASIN B0F24QPC14
Color Red
Brand Name Keepro
Unit Count 1.0 Feet
Item Length 10 Inches
Manufacturer Keepro
Material Type Aluminum, Brass, Hybrid Rubber and PVC
Maximum Pressure 300 Pound per Square Inch
Outside Diameter 0.75 Inches
Included Components Air Hose, Brass Fittings
Item Dimensions L x W 10"L x 0.75"W
Nominal Wall Thickness 0.375 inches

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.1 out of 5
★★★★★
80 ratings | 33 reviews
How item rating is calculated
View all reviews
5 stars
77% (62)
4 stars
7% (6)
3 stars
4% (3)
2 stars
2% (2)
1 star
10% (8)
Sort by

There are currently no written reviews for this product.